• Home
  • Who We Are
  • What We Do
  • Projects
  • Careers
  • Contact Us
  • More
    • Home
    • Who We Are
    • What We Do
    • Projects
    • Careers
    • Contact Us
  • Home
  • Who We Are
  • What We Do
  • Projects
  • Careers
  • Contact Us

MAJOR ONGOING PROJECTS

I-205 Abernethy Bridge

WTF will provide safety railings, significant steel support structures, and structures to protect fish during construction to Kiewit for the ODOT I-205 Abernethy Bridge expansion project that will result in an additional lane in each direction and seismic improvements to make it earthquake-ready. 

Nickajack Lock Culvert Valve Bulkheads

WTF will provide bulkhead gate storage racks to support the US Army Corps of Engineers' operation and maintenance of this hydroelectric dam's critical navigation lock on the Tennessee River. 

Willamette & Columbia River Dredge Pipe

These pipes are used to maintain the shipping channel from the Port of Portland to the Pacific Ocean, which is critical for the local economy in general, and for our own future work supplying clean energy infrastructure along the Oregon coast.

Cedar Rapids Roller Gate

This flood control gate helps the US Army Corps of Engineers to protect people from increasingly frequent flooding on the Cedar River.  WTF will provide the fabricated, painted, and assembled roller gate, along with all of the embedded steel structures that support the gate.

Bonneville Dam Sluiceway Roller Gate

This is a complex wheeled lift gate for opening and closing the sluiceway on the Bonneville Dam.  The sluiceway is a critical part of the US Army Corps of Engineer's operation of the dam and keeps floating debris (like tree branches) from getting into the turbines.  

SELECT COMPLETED PROJECTS

McNary Dam Bulkheads

These bulkhead gates allow the US Army Corps of Engineers to block water flow through any of the hydropower turbine generators on the McNary Dam on the Columbia River, which can then be dewatered to allow personnel to do maintenance work on the turbine.

Little Goose Dam Fish Pump Bulkhead

This  hydro gate allows the US Army Corps of Engineers to safely operate  a fish pump  on the Little Goose lock and dam on the Snake River that allows salmon and other fish to pass upstream to their spawning areas by lifting them to the higher water level above the dam.

Industrial Bridge and Support Structure

This bridge serves both as a walkway for personnel and also as a support platform for equipment that services a massive storage tank and allows the contents to be stored safely.

Heavy-Duty Steel Work Boats

These steel work boats are used in heavy construction on waterways such as our bridge and clean energy projects, and are designed and reinforced to withstand the physical abuse inherent in such work.

Future Projects

WTF is conducting research & development and scaling up to meet the rapidly growing demand for innovative clean energy infrastructure that will help the world become independent from fossil fuels and combat climate change. We are specifically focusing on:

  • pumped storage hydropower
  • floating offshore wind turbine platforms
  • wave energy devices

Please contact us at connect@wtfllc.com if you are interested in partnering!

Copyright © 2023 Willamette Technical Fabricators - All Rights Reserved.

Powered by GoDaddy Website Builder

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept